When a question arises at midnight before your TM12 exam, you should not have to wait for business hours. Support at DumpsActual is available 24/7, and 65 practice questions for BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) are ready whenever you are.
| Certification Vendor: | BCS / ISTQB |
|---|---|
| Exam Name: | ISTQB-BCS Certified Tester Advanced Level - Test Manager (2012) |
| Exam Number: | TM12 |
| Available Languages: | English |
| Exam Duration: | 180 minutes |
| Related Certifications: | ISTQB Certified Tester Advanced Level - Technical Test Analyst ISTQB Certified Tester Foundation Level (CTFL) ISTQB Certified Tester Advanced Level - Test Analyst |
| Exam Format: | Closed Book, Complex Multiple Choice |
| Passing Score: | 65% |
| Certificate Validity Period: | Lifetime |
| Real Exam Qty: | 65 |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based or paper-based examination through accredited BCS/ISTQB examination providers; onsite and online delivery may be available depending on provider. |
| Pre Condition: | Candidates must hold the ISTQB Certified Tester Foundation Level (CTFL) certificate and typically have practical software testing experience. |
| Official Syllabus URL: | https://www.bcs.org/qualifications-and-certifications/certifications-for-professionals/software-testing-certifications/istqb-certified-tester-advanced-level-test-manager/ |
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Test Management | 40% | - Test Management Activities
|
| Topic 2: People Skills | 7% | - Team Management
|
| Topic 3: Test Tools and Automation | 8% | - Tool Support
|
| Topic 4: Improving the Testing Process | 5% | - Process Improvement
|
| Topic 5: Reviews | 10% | - Review Management
|
| Topic 6: Defect Management | 10% | - Defect Lifecycle
|
| Topic 7: Testing Process | 20% | - Test Process
|
Candidates must hold the ISTQB Certified Tester Foundation Level (CTFL) certificate and typically have practical software testing experience.
Allocate study time in proportion to each topic's weight.
The TM12 exam has 65 questions with a 180 minutes-minute time limit. Practicing under the same constraints on DumpsActual builds the pacing habits you will need on test day.
The PC engine installs on your computer and simulates the real exam scenario with timed tests and performance marking. The online engine runs in your browser, needs no installation, works on most devices, and is often the more stable option when you switch machines frequently.
The package includes 65 practice questions for the TM12 exam, covering the current BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) objectives with verified answers.
We support Credit Card payment because it is built around buyer protection: if a purchase issue ever arises, the card network's dispute process protects your money. Combined with our refund policy, that keeps your BCS ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) purchase low-risk.
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.
The requirements specification document contains several SLAs (Service Level Agreements) like the following:
SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.
Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?
Number of correct responses: 1
Correct Answer: D 🗳️
You are managing the system testing for a SOA based system. The integrated system consists of several subsystems:
-a SOA middleware
-a CRM (Customer Relationship Management) system
-a BRM (Billing and Revenue Management) system
-a SMS (Subscriber Management System) system and you performed a risk analysis based on these subsystems.
At the end of the scheduled period for test execution you produce a first classical report based on the traditional metrics of testing. Test pass/fail status and bug status (open/resolved) That table provides you a distorted picture of the quality risk, because there is no indication of the risk level of the failed tests, the tests not run, or the open bugs.
Thus, you produce the following table to solve this distortion issue:
In the table above, where you have introduced the concept of risk weighting, the highest risk test or bug report has a score of 1, while the lowest risk test or bug report has a score of 0.04.
Which of the following subsystems, based on the risk scores of the table, is most risky?
Number of correct responses: 1
Correct Answer: D 🗳️
You can count on well-written requirements, but you can't count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing.
Which of the following test activities would you expect to be the less important in this context?
Number of correct responses: 1
Correct Answer: A 🗳️
Assume you are managing the system testing execution phase of a project.
The system test execution period for that project is scheduled for eighteen weeks and the release date is scheduled at the end of system testing.
During the sixth week of system test execution, at the staff meeting, the project manager informs you that the project deadlines are changed and the release date that is only three weeks ahead.
This new release will not allow the completion of the system tests. Suppose also that you have followed a risk-driven test approach for this project.
Which of the following statements represents the worst way to lead your test team in the next three weeks?
Number of correct responses: 1
Correct Answer: B 🗳️
Based on the historical data of 5 past and similar projects, you have calculated these average numbers of defects detected in system testing:
-for each 10000 LOC (lines of code), 200 defects
-for each person-month of development team effort, 49 defects
You want to use this information to perform estimation for a new project.
The project manager tells you that he/she has estimated 20000 new LOC for this new project.
Four developers work for four months on this project before system testing.
During system testing, 797 defects are discovered.
Assume that the system test of this new project is using the same amount of work as spent in the past projects.
Based on this information only, which of the following statement is certainly true about this project?
Number of correct responses: 1
Correct Answer: B 🗳️
Viewing page 1 out of 13 pages.
Viewing questions 1-5 out of 65 questions.
Over 76101+ Satisfied Customers
1127 Customer ReviewsCustomers Feedback (* Some similar or old comments have been hidden.)I had got my certificate for TM12 exam, and now, I recommend t to you, and I hope they can help you.
With this TM12 practice engine, i was putting the effort and ready for the exam. Yes, i truly passed it. Thanks!
So glad to know I passed the TM12 exam! I purchased the TM12 study materials formDumpsActual. It is proved a wise choice!
Very cool TM12 exam questions! They worked well for me, i got a high score as 96%. Thank you, all the team!
The TM12 learning materials in DumpsActual can help you pass with high efficiency, and I passed the exam with 90% score.
Hello guys, buy this TM12 practice engine, it can helpfully guide you to pass the test. I have passed mine, it is a pleasure to share with you!
Passed TM12 Exam with score 75% after study this TM12 exam, as my only materials.. without study any other videos or books. Thank you!
While I was looking for really worthy TM12 exam dumps, I found the DumpsActual website and, guys, this is it! Great content as I passed last week’s exam so easily! I can’t believe!
It is my favorite testing engine for TM12 exam.
I took TM12 exam last week and passed the test.
It is 100 percent authentic TM12 materials and it is the best way to learn all the important things. I used it and passed my exam.
it is unbelievable i passed the TM12,so much appreciate.....
I passed my TM12 certification exam by studying from DumpsActual. They have very informative mock exams and testing engines. I scored 94% Highly suggested
Luckily, I passed the test.Many of my friends were against the idea of using TM12 exam tools but I proved them wrong when I scored 96% marks in TM12 exam.
Prepared for the TM12 exam with pdf dumps and practise exam by DumpsActual. Highly recommend everyone to study from these and surely you will score well.
Thanks for TM12 dump helped me, although there are 9 questions weren´t in dump, I still passed the exam today.
DumpsActual have made my work easier, TM12 exam is not tough anymore. Thanks!
DumpsActual Practice Exams are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development - no all study materials.
If you prepare for the exams using our DumpsActual testing engine, It is easy to succeed for all certifications in the first attempt. You don't have to deal with all dumps or any free torrent / rapidshare all stuff.
We are committed to the process of vendor and third party approvals. We believe professionals and executives alike deserve the confidence of quality coverage these authorizations provide.
DumpsActual offers free demo of each product. You can check out the interface, question quality and usability of our practice exams before you decide to buy.