ASQ Certified Quality Engineer CQE Exam is related to Certified Quality Engineer Certification. This exam validates the Candidate knowledge of principles of product and service quality evaluation and control. It also tests a Candidate development and management skills of management information systems to audit quality systems for deficiency identification and correction. It also deals with the knowledge of human factors, motivation, familiarity with quality cost concepts and techniques.

 

NEW QUESTION 83
Which of the following problem-solving tools is a column graph which displays a static picture of the process?

  • A. Pareto chart.
  • B. Histogram.
  • C. Cause and effect diagram.
  • D. Control chart.

Answer: B

 

NEW QUESTION 84
A bin contains 40 pills with a weight of 3.1 gm. each, 30 pills weighing 3.2 gms each and 10 pills weighing
3.3 gms each. The weight of an average pill is found from

  • A. Option B
  • B. Option C
  • C. Option A
  • D. Option D

Answer: D

 

NEW QUESTION 85
An X-bar chart has shown control for a long time. You see that points for the last 50 samples are all very near the center line on the chart. In fact, they are all within one sigma of the center line. This probably indicates that

  • A. The control charts are incorrectly computed.
  • B. The process standard deviation has decreased during the time the last 50 samples were taken.
  • C. It is an undesirable situation.
  • D. It is a desirable situation.

Answer: B

 

NEW QUESTION 86
Which table should be used to determine a confidence interval on the mean when standard deviation is NOT known and the sample size is 10?

  • A. t
  • B. Chi-Square
  • C. F
  • D. z

Answer: A

 

NEW QUESTION 87
The Shewhart or Deming cycle is often referred to as

  • A. Problem solving flow chart.
  • B. The cause and effect diagram.
  • C. Plan-do-check-act.
  • D. The affinity diagram.

Answer: C

 

NEW QUESTION 88
Of the services listed below, which one performed by design engineering is of particular interest to QA personnel?

  • A. Rework criteria.
  • B. Audit reports.
  • C. Change action.
  • D. Cost reports.

Answer: C

 

NEW QUESTION 89
An audit will be viewed as a constructive service to the function which is audited when it

  • A. Proposes corrective action for each item uncovered.
  • B. Is conducted by nontechnical auditors.
  • C. Furnishes enough detailed facts so the necessary action can be determined.
  • D. Is general enough to permit managerial intervention.

Answer: C

 

NEW QUESTION 90
When requesting "worst case" design analysis, you expect the reliability group to

  • A. Determine whether product requirements can be met with subassemblies assumed at their worst combination of tolerances.
  • B. Analyze the worst rejects.
  • C. Assume all subassembly tolerances at their maximum limit.
  • D. Analyze only those products failing to meet specification requirements.

Answer: A

 

NEW QUESTION 91
The distribution of a characteristic is negatively skewed. The sampling distribution of the mean for large samples is:

  • A. Approximately normal.
  • B. Positively skewed.
  • C. Negatively skewed.
  • D. Lognormal.

Answer: A

 

NEW QUESTION 92
Reliability prediction is
. The process of performance estimation.
. The process of estimating the probability that a product will perform its intended function for a stated time.
. The process of telling "how you can get there from here".

  • A. I only
  • B. I,IIandIII
  • C. IIandIIIonly
  • D. IIonly

Answer: D

 

NEW QUESTION 93
When asked to make recommendations on how to correct any deficiencies noted in the exit report, the auditor(s) should

  • A. Offer no specific advice and few suggestions.
  • B. Confer with the client first.
  • C. Make the best recommendation possible.
  • D. Avoid a recommendation in writing but help the auditee of possible.

Answer: A

 

NEW QUESTION 94
An X-bar chart has shown control for a long time. You see that points for the last 50 samples are all very near the center line on the chart. In fact, they are all within one sigma of the center line. This probably indicates that

  • A. The control charts are incorrectly computed.
  • B. The process standard deviation has decreased during the time the last 50 samples were taken.
  • C. It is an undesirable situation.
  • D. It is a desirable situation.

Answer: B

 

NEW QUESTION 95
In most cases, an improvement team facilitator will NOT normally:

  • A. Function as the group leader.
  • B. Provide feedback to the group.
  • C. Summarize key ideas generated by the group.
  • D. Be familiar with problem solving techniques.

Answer: A

 

NEW QUESTION 96
Which of the following items is the MOST important consideration when selecting an audit team member?

  • A. Being competent in many quality control techniques.
  • B. Being competent in auditing techniques.
  • C. Having technical knowledge of the area being audited.
  • D. Being familiar with the organization that will be audited.

Answer: B

 

NEW QUESTION 97
In the failure rate model shown below, which one of the sections represents the period when catastrophic failures are likely to occur?

  • A. All sections can experience catastrophic failure.
  • B. B
  • C. A
  • D. C

Answer: A

 

NEW QUESTION 98
A product failure in the customer's hands is bad for the company. Why do only 4% of the customers normally file a complaint?

  • A. A warranty is in place on the product.
  • B. The product guarantee takes care of the product.
  • C. It is a minor inconvenience.
  • D. They don't think it will do any good.

Answer: D

 

NEW QUESTION 99
What percentage of the area under the standard normal curve is included within (+/-) 1.5 standard deviations from 0?

  • A. 0.7500
  • B. 0.8664
  • C. 0.9332
  • D. 0.6680

Answer: B

 

NEW QUESTION 100
For TQM success, what structure sequence should be followed?
I. Develop a quality policy.
II. Establish a quality council.
III. Establish strategic quality goals.
IV. Train for internal audits.

  • A. I, II, III, IV
  • B. II, III, I, IV
  • C. II, I, III, IV
  • D. III, II, I, IV

Answer: C

 

NEW QUESTION 101
The "least squares method" is used in

  • A. Calculating σ2
  • B. 2
    Calculating σ and s2
  • C. The central limit theorem
  • D. Calculating a best fit regression line.

Answer: D

 

NEW QUESTION 102
A process has been experiencing problems lately. The operators charting the process have identified the cause to be due to a change in incoming materials. This problem is

  • A. A normal event.
  • B. A common cause.
  • C. A special cause.
  • D. Attributed to purchasing.

Answer: C

 

NEW QUESTION 103
As the scatter of points about a regression line becomes less, r2 will

  • A. Become smaller.
  • B. Become larger.
  • C. Approach a value of 1.
  • D. Be unaffected.

Answer: C

 

NEW QUESTION 104
A lot is known to be 1.2% defective. Five units are randomly selected from the lot, and the lot is accepted if 1 or fewer defects are found. What is the probability of the lot being rejected?

  • A. 0.00223
  • B. 0.9985
  • C. 0.01
  • D. 0.00173

Answer: D

 