To be eligible to take the APICS CPIM Certification Exam, candidates must have at least two years of experience in the manufacturing or supply chain industry, or they must have completed a relevant degree program. Candidates must also complete a series of study modules and pass a comprehensive exam for each part of the certification.

 

NEW QUESTION # 265
What is concerned with the transfer of ownership and its function is to negotiate, sell, and contract?

  • A. Transaction channel
  • B. Business channel
  • C. Distribution channel
  • D. Contracted channel

Answer: A


NEW QUESTION # 266
The line between two or more supply sources where the laid-down cost is the same is known as:

  • A. Production boundary
  • B. Inventory line
  • C. Market boundary
  • D. Cost line

Answer: C


NEW QUESTION # 267
The time a job waits at a work center before being handled is called:

  • A. Wait time
  • B. Linger time
  • C. Queue time
  • D. Interval time

Answer: C


NEW QUESTION # 268
This figure shows that:

  • A. Both of these
  • B. The various capacity plans relate only to their levels in the priority plan not to subsequent capacity planning levels
  • C. None of these
  • D. The upper levels of the priority planning are input to lower levels

Answer: A


NEW QUESTION # 269
If demand or lead time is greater than forecast, then what will occur?

  • A. Unpredictable stock
  • B. Stockout
  • C. Invaluable stock
  • D. Vulnerable stock

Answer: B


NEW QUESTION # 270
To maintain the desired level of customer service by maintaining finished-goods inventory levels or by scheduling to meet customer delivery requirements.
1. To make the best use of material, labor and equipment.
2. To maintain inventory investment at the required levels.
These are the objectives of:

  • A. MPS
  • B. Production plan
  • C. MPR II
  • D. MRP

Answer: A


NEW QUESTION # 271
In bills of Material structure; Summarized parts list:

  • A. Both A & B
  • B. Does not contain any information about the way the product is made or assembled
  • C. It's the list of comments are linked to their parents by listing them immediately below the parents
  • D. The lists of all the parts needed to make one complete assembly

Answer: A


NEW QUESTION # 272
A statistical value that measures how closely the individual values cluster about the average is called:

  • A. Sigma valuation
  • B. Standard deviation
  • C. Order point
  • D. Mean value

Answer: B


NEW QUESTION # 273
The purchase cost of the stock-keeping units or the cost of manufacturing the item is called:

  • A. Key cost
  • B. Unit cost
  • C. Economic cost
  • D. Elementary cost

Answer: B


NEW QUESTION # 274
When a job might be expanded to include a sequence of activities instead of only one activity, this is called

  • A. Vertical enlargement
  • B. Horizontal enlargement
  • C. Parallel expansion
  • D. Correspondence expansion

Answer: B


NEW QUESTION # 275
is the most detailed, complete and accurate of the capacity planning techniques.

  • A. Resource planning
  • B. Capacity control
  • C. capacity requirements planning (CRP)
  • D. Capacity requirements planning

Answer: C


NEW QUESTION # 276
Which of the following are the two sources of specifications?

  • A. Buyer specification & Buyer specification
  • B. Seller specification & Standard specification
  • C. Buyer specification & Standard specification
  • D. Standard specification & Engineering specification

Answer: C


NEW QUESTION # 277
Who is responsible for producing the products and services the customer wants, when wanted, with required quality, at minimum cost and maximum effectiveness and productivity?

  • A. Marketing management
  • B. Production management
  • C. Operations management
  • D. Product-review management

Answer: C


NEW QUESTION # 278
The message in which the planner must tell the MRP software of all actions taken that will influence the MRP records called

  • A. Exception messages
  • B. None of the above
  • C. Bottom-up re-planning
  • D. Transaction messages

Answer: D


NEW QUESTION # 279
Which of the following are three important factors must consider in managing the material requirements plan?

  • A. Planned orders, released orders and firm planned orders
  • B. None of the above is true
  • C. Priority, Bottom-up Replanning and reducing system nervousness
  • D. Priority, Exception message and transaction message

Answer: C


NEW QUESTION # 280
What uses cost determined before production begins?

  • A. Analysis cost
  • B. Cost of quality
  • C. Average cost
  • D. Standard cost

Answer: D


NEW QUESTION # 281
Exploding is the process of multiplying the requirements by:

  • A. Both A & B
  • B. None of the above
  • C. The usage quantity
  • D. By recording the appropriate requirements throughout the product tress

Answer: A


NEW QUESTION # 282
Quality and delivery factor of products tend to have increased importance during:

  • A. Maturity phase
  • B. Introduction phase
  • C. Decline phase
  • D. Growth phase

Answer: D


NEW QUESTION # 283
_ is a rate of doing work, not the quantity of work done.

  • A. Capacity Control
  • B. Capacity
  • C. Capacity required
  • D. Capacity Planning

Answer: B


NEW QUESTION # 284
A load made up of a number of items or bulky material, arranged or constrained so the mass can be picked up or moved as a single unit too large for manual handling in called:

  • A. Contemporary load
  • B. Package load
  • C. Pallet load
  • D. Unit load

Answer: D


NEW QUESTION # 285
Manufacturing process can be conveniently organized into following categories EXCEPT:

  • A. Intermittent Manufacturing
  • B. Project Manufacturing
  • C. Flow Manufacturing
  • D. Work Center Manufacturing

Answer: D


NEW QUESTION # 286
A distributor has decided to implement push replenishment throughout its network. Which action is most consistent with this decision?

  • A. establishing double order points
  • B. establishing a bill of distribution
  • C. establishing lead times
  • D. establishing safety stocks

Answer: B


NEW QUESTION # 287
......


To be eligible for the CPIM certification exam, candidates must have at least two years of experience in operations management or a related field. The CPIM certification program offers flexible learning options, including self-study materials, online courses, and instructor-led training. The certification exam consists of multiple-choice questions and is computer-based. Upon passing the exam, candidates will receive a CPIM certification that is valid for five years, after which they will need to recertify to maintain their credentials.

 

Valid CPIM Test Answers & APICS CPIM Exam PDF: https://www.dumpsactual.com/CPIM-actualtests-dumps.html

APICS CPIM Certification Real 2023 Mock Exam: https://drive.google.com/open?id=1PVwttfgTrXaFp01VQFkDcUbzl1_GgECz